New flue gas source at TCM
In 2017 In 2017, Equinor decided to execute a plan to shut down the combined heat and power plant (CHP) in the coming years. This CHP plant is located adjacent to TCM testing facility and is based on a combined cycle gas turbine (CCGT) with two gas turbines, each with a waste heat recovery unit. …